Open Cell Aluminum Foam
Open Cell Aluminum Foam
Open-cell aluminum foam refers to aluminum foam with interconnected internal pores, with a pore size of 0.5-1.0mm, a porosity of 70-90%, and a porosity of 55-65%. Due to its metal characteristics and porous structure, through-hole aluminum foam has excellent sound absorption and fire resistance, and is dust-proof, environment-friendly and waterproof, and can be used as a noise reduction material for a long time under complex working conditions. Noise reduction coefficient NRC>0.75, fire protection grade A1, and through-hole foamed aluminum with different flow resistance and through-hole aperture (through-hole ratio) can be customized.
Production Description & Features
Open-cell aluminum foam refers to aluminum foam with interconnected internal pores, with a pore size of 0.5-1.0mm, a porosity of 70-90%, and a porosity of 55-65%. Due to its metal characteristics and porous structure, through-hole aluminum foam has excellent sound absorption and fire resistance, and is dust-proof, environment-friendly and waterproof, and can be used as a noise reduction material for a long time under complex working conditions. Noise reduction coefficient NRC>0.75, fire protection grade A1, and through-hole foamed aluminum with different flow resistance and through-hole aperture (through-hole ratio) can be customized.
![005 1-2](https://www.metalfoamweb.com/wp-content/uploads/2021/07/1-2.png)
![004 2-2](https://www.metalfoamweb.com/wp-content/uploads/2021/07/2-2.png)
Aluminum Foam Process
![Production Process 1 Production-Process-1](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Production-Process-1.jpg)
Thickening
![Production Process 2 Production-Process-2](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Production-Process-2.jpg)
Stirring TiH2
![Production Process 3 Production-Process-3](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Production-Process-3.jpg)
Pulling and Foaming
![Production Process 4 Production-Process-4](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Production-Process-4.jpg)
Cooling
![001 1-1](https://www.metalfoamweb.com/wp-content/uploads/2021/07/1-1.jpg)
Processing
![Processing Processing](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Processing.jpg)
Application – Military
![Military Military](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Military.jpg)
Application – Modular integrated housing
![Modular integrated housing Modular-integrated-housing](https://www.metalfoamweb.com/wp-content/uploads/2021/07/Modular-integrated-housing.jpg)
Workshop
![4345 4345](https://www.metalfoamweb.com/wp-content/uploads/2021/07/4345.jpg)
Packing Details
![66 66](https://www.metalfoamweb.com/wp-content/uploads/2021/07/66.png)
![67 67](https://www.metalfoamweb.com/wp-content/uploads/2021/07/67.jpg)
FAQ
1.MOQ: 100m²
2.Delivery time: around 20days after confirm order.
3.For LCL goods, the payment terms is 100% T/T payment in advance.
4.For full container, the payment terms is 50% deposit in advance, 50% balance before the shipment date.